You are at: Home >> Business >> Energy Engineering

 

Prime Minister of Bangladesh ZIA
presenting herself at the Contraction Starting  Ceremony Barapukuria Power Plant  Development Project
  CMC enjoys a high reputation in the field of international project contracting in mining and power industries. The coalmine project with an annual output of 1 million tons located in Barapukuria, undertaken by CMC, is the first modern coalmine in Bangladesh. As a foreign general contractor, CMC is responsible for survey, feasibility study, design of base and drawings, equipment purchasing, construction, installation,

Signing Ceremony of Contract Memo for Barapukuria Power Plant Development Project in the presence of PM ZHU RONGJI and PM ZIA in Bangladesh 

and testing and trial operation of the project. It has also undertaken the construction of a 2X125MW coal fired power station in Barapukuria, as a general contractor, which is the first coal-fired power plant in Bangladesh. Under this project, CMC cooperates with two well-known British consulting companies, WARDELL ARMSTRONG and INTERNATIONAL MINING CONSULTANCY, to render consulting service related to mine construction and production while working with PDP from New Zealand in giving consulting service concerning water prevention, rock features and structure of coalmine. CMC signed Barapukuria Coal Mine Management and Production Cont
Signing Ceremony of Contract emo for
Management Production and Maintenance Services of Barapukuria Coal Mine
ract in June,2005 which stipulates that the joint contractor consisting of CMC and Xuzhou Mining Industry Group are responsible for the management of production system after the coal mine is turned over and 4.75 million ton raw coal would be produced for the owner within the next 68 months. It has been the largest project of the export of technology and labor service that China has in Bangladesh ever since.

Based on the Barapukuria coal mine project, CMC has made deep exploration to the energy construction market of Bangladesh and won the satisfaction of Bangladesh with the service of high quality and high efficiency which enables us to undertake two important follow-up projects (Barapukuria coal fired power plant project and Barapukurian coal mine management and production project), which is a real innovation in the history of Chinese enterprise overseas project contracting. The total contract price of all three projects amounts almost US$500 million. After construction and operation the three projects will be significant for Bangladesh to realize the diversity of energy supply and guarantee of energy security. The successful contracting and execution of these projects shows that CMC has already had the core ability to provide comprehensive resolution to the large-sized overseas energy construction projects, which not only has boosted the export of China’s technology, equipment and labor service and generated favorable comprehensive economic returns, but also won high reputation for Chinese enterprises in Bangladesh and its surrounding markets.

Barapukuria coalmine project is the first coalmine turn-key project undertaken by a Chinese enterprise in the world market. This project and pit mouth power plant project are both of vital importance for Bangladesh to make advantage of its coal resources to develop domestic energy industry, which are highly valued by Chinese and Bangladesh governments. These two projects are both of great significance in promotion of bilateral economic and trade relationship between China & Bangladesh and also play a very important role in the bilateral economic and trade cooperation.

Energy Engineering Business Department is the business department specialized in garbage power plant project in China National Machinery Import & Export Corporation. We have the technologies and equipments of marsh gas purifying and garbage generating. We can refine marsh gas from garbage firstly; purify nature gas from marsh gas secondly; then use nature gas generate electricity or fill them in citys civil gas pump lines for civilizations life or as clean fuel for automobile. Craftwork Process Diagram of Integrated  Treatment and Utilization of Garbage

 

Site Survey by Mr. Chen Weigen, Chairman of the Board of Generte

 

Signing Ceremony of the Contract for Management Production and Maintenance Service of Barapukuria Coal Mine By Mr. Tang Yi, President of CMC

 

Singing Ceremony of Barapukuria Coal Mine Contract by Mei Haolin, vice president of CMC, with the Owner of Bangladesh, on Jan 1994

 
Ceremony of Government Guarantee Submission
 
 Site Survey by Finance Minister of Bangladesh
 
Site Survey by Chairman of Power Development Board of Bangladesh

 

Copyright @2007 China National Machinery Import & Export Corporation All Rights Reserved